INDIA - RE Installed Capacity as on 29.02.2024: Wind - 45,154 MW; Solar - 75,576 MW; Other RE - 15,841 MW

Stage 1 - Site Development

  • Site Identification
  • WRA (Wind Resource Assessment)
  • Load Flow Study
  • Micro Sitting
  • Evacuation Permits
  • Land, Soil and Logistic Survey
  • Permits & Approvals

Stage 2 - Land & RoW

  • Acquisition of Land for WTG
  • Land for Solar Plant
  • Land for Sub-Station

Stage 3 – Infrastructure Development

  • Soil Testing, Plant design
  • Road Construction
  • Crane pad, hardstand Foundations
  • Unit switch yard
  • SCADA

Stage 4 - WTG Erection & Commissioning

  • Crane Arrangements
  • Supply of Components to Site Locations
  • Erection / Installation
  • Commissioning of WTG / Solar Plant
  • Execution of PPA

Stage 5 - Power & Grid

  • Supply & Erection of Electrical Equipments
  • Construction of substation
  • Transmission Line

Stage 6 - Operation & Maintenance

  • O&M for WTG
  • O&M for Substation

Astrawind assumes responsibility for O&M services within the BOP segment of its projects, sparing clients the need for direct involvement. We ensure the continued smooth operation of energized wind and solar assets throughout their lifecycle.